广深港高铁香港部分试运营
文章来源:未知 文章作者:enread 发布时间:2018-04-01 07:28 字体: [ ]  进入论坛
(单词翻译:双击或拖选)
The Hong Kong section of the Guangzhou-Shenzhen-Hong Kong Express Rail Link (XRL) has started trial operations on April 1, 2018, reports the Changjiang Daily.
 
《长江日报》报道,广州-深圳-香港高铁香港部分已于4月1日开始试运营。
 
Through the new rail link, which will be connected to the 25,000 kilometer national high-speed rail network, a total of 16 Chinese mainland1 cities, including Beijing, Shanghai and Wuhan, will have express trains to Hong Kong, according to the report.
 
The XRL is 142 kilometers in total, including 116 kilometers on the Chinese mainland and 26 kilometers in Hong Kong.
 
There are two stations in Hong Kong, including the terminus and Kowloon West.
 
The train will run at speeds of 200 kilometers per hour.
 
From Hong Kong, it will take about 23 minutes to get to Shenzhen and about 48 minutes to get to Guangzhou, when completed sometime in the 3rd quarter of 2018.
 
China's new generation Fuxing bullet2 trains will be run on the XRL.


点击收听单词发音收听单词发音  

1 mainland 6AexH     
n.大陆,本土
参考例句:
  • The new bridge will link the island to the mainland.新的桥梁将把该岛与大陆连接在一起。
  • Hong Kong's prosperity relies heavily on mainland.香港的繁荣在很大程度上依赖于大陆。
2 bullet GSUyA     
n.枪弹,子弹
参考例句:
  • The bullet wound in his shoulder was opened up for treatment.切开他肩上的枪伤进行治疗。
  • The bullet missed me by a hair's s breadth.那颗子弹差一点就打中了我。
TAG标签: train express rail
发表评论
请自觉遵守互联网相关的政策法规,严禁发布色情、暴力、反动的言论。
评价:
表情:
验证码:点击我更换图片